Sunday, November 30, 2008

Playing Catch-up

Oh jeez- almost a month since my last post! I am so sorry.

There actually has been knitting going on around here.

I started & finished a Koolhaas with yarn my mom gave me last year. Handspun from North Carolina! It's single ply, and gives the hat a nice fluffy aura and plenty of comfy squishiness.


I meant to be knitting the hat to donate to an auction I am co-directing at the law school, but I ended up loving it too much to give it away! So, I immediately cast on for another.


This one is in Cascade 220, in the color "straw wheat" (I think). I bought a sweater's worth back in the spring and when it arrived, I decided it was too bright for a whole sweater. So, I made a pair of fingerless mitts for a friend for Christmas (no photos yet, sorry!) and started this hat.

I am planning on knitting a cropped sweater out of this yarn anyway. I have 5 or 6 skeins left, and just have to pick a pattern. And finish up Christmas knitting.

This holiday weekend has been quite relaxing and (mostly) wonderful. We spent Thanksgiving at our house with roomie Liz - 12 pounds of turkey for the three of us!! It was an amazing traditional feast, and a great day. We swore off the internet and computers all day and challenged ourselves to play every single board game we own. We made it through 5 or 6 games- not nearly all we own, but a big chunk anyway!

Friday we decorated our mantle (I love having a fireplace!!) and hung some lights up outside.


Then, yesterday, after a fairly grumpy and cranky morning and a rejuvenating walk through the arboretum, Mike gave me a ring and asked me to marry him!



We've been engaged since July when I asked him, and I've (especially lately) been really wanting a ring from him. It's a gorgeous deep red stone on a sterling silver band. We both expect these rings to be worn only until the wedding (in a year an a half), so the soft metal isn't a problem. His is sterling silver too, and I think they really look lovely together!

Reading period starts next week, so don't expect to hear from me until right around Christmas!

Have a lovely December, everyone!

Friday, November 7, 2008

Super Secret Knitting

Attention: If your name is Mike, STOP READING NOW!!

*
*
*
*

Is he gone?

I've been working on some super secret knitting for Christmas. Luckily, Mike has been spending nearly 12 hours a day working with the marching band at a local high school for his student teaching, so I've had a lot of time to knit when he's not around.

I wanted to knit him a stocking last year, but just didn't have time. This year, I am much less dedicated to my schoolwork. And, I received a gift of red and green wool yarns, one skein of each. Perfect for a stocking!

The pattern is the Falling Snow Stocking from Jennifer Hoel. I'm making a few modifications: contrast band with Mike's name in white, short row contrast heel in green, and continuing the small snowflakes down the foot. I'm also planning on a contrast, perhaps short row, heel.

Mike finishes marching band this weekend, so I'm knitting my little heart out to get this done!

Wednesday, October 29, 2008

Thank you!

Thank you to everyone who commented on my last post, the Placed Cable Aran Sweater!

I feel a little guilty now that I didn't post a full FO post on the sweater. Without further ado, the full details. (To see the sweater in question, look to the post below this).

Pattern: Placed Cable Aran, from Interweave Knits, Fall 07
Yarn: Cascade 220 Wool, about 5 (maybe?) skeins, in color 4009 (Aporto).
Needles: US 8 / 5 mm circulars
Started: August 19
Finished: October 16

Modifications: I left off the cable design from the back of the sweater (easier to tell front from back, so I won't be afraid of wearing it backwards!), knit in the round, and added some simple waist shaping. I think I did 5 paired decreases and then five paired increases. After blocking, they ended up in just the right place!

I knit the sleeves to the suggested length, 17" I think, but when I tried the sweater on (pre-blocking) the sleeves were about 4" too short! I unpicked the bind-off and knit down four inches. After blocking, the sleeves were too long, but after a few days of wear, they are now just right.

I love this sweater. It was so easy, with minimal finishing. Sew up the sleeves, attach em, and weave in some ends! I highly recommend knitting this in the round, if you're inclined to do such things.

The yarn is great - Cascade 220 wool is a good standby. The color is amazing, a deep bright blue with flashes of green if you're looking at it in the right light.

All in all, a resounding success!

I apologize for not responding to everyone's comments individually - I have not figured out how to get Blogger to give me the email addresses of those who comment. But please know I greatly appreciate each and every comment and compliment! Thank you so much!

Sunday, October 26, 2008

A Wool Sweater in Time for Fall

I finished a sweater! And I've been wearing it constantly since I finished it! But, I'm a slacker-blogger and have neglected to share it with you.

I finished it last week (except for two ends I've since discovered I forgot to weave in) and Mike snapped some photos while we were on a walk with our room mate's dog and Mike's aunt and uncle who were visiting for the weekend. (Hi Renee!)


It's the Cable Aran. And I love it. I love the collar, the color, the cables, everything!


I left the cables off the back and had to extend the sleeves by 4" and it is now the perfect sweater! Just in time for fall.

Saturday, October 4, 2008

Friday, October 3, 2008

Knitting: Go!



I've been so delinquent in my blogging! I truly apologize. Fall is here, and I've been knitting.

First, the cable aran. I finished both sleeves last night (debate knitting) and am about to pick up the stitches for the neck. Then, it's just finishing!

This isn't the world's most illustrative photo, but I think it shows one important thing: it fits! I think the rolling hem makes it a leeetle too short, but hopefully a good blocking will correct that. I also didn't do the maths to place my waist shaping exactly where my waist is, but at least it isn't an entirely shapeless sweater.

Next, gift knitting!

I sent these out last week, so hopefully they have arrived.

My friend Damaris (check out her awesome cooking blog, Kitchen Corners) asked for a cupcake toy for her two year old back in the beginning of the summer. I finally sat down and cranked this baby out two weeks ago. Red velvet cake with cream cheese frosting and a cherry on top. Yum!

The booties are good luck booties, as Damaris wants a baby girl when she gets pregnant again.

Funny story: one of my professors has granted me permission to knit in class. The day I brought in the booties was the day we were discussion gender nonconformity and transgender legal issues. I felt so conspicuous, knitting highly gender-conforming and gender-stereotype-enforcing bright pink baby booties. However, hopefully that class just infused the booties withe kick-ass gender nonconformity vibes and the (as yet still wholly potential) baby will wear them, no matter its gender, and will grow up in a gender equal society.

Here's hoping, anyway!

Sunday, September 21, 2008

Placed Aran Cable front

Yesterday we made our first fire in the fireplace and I curled up with some law books. When I finished those, I made a soup and sat down to make some serious progress on the Placed Cable Aran Sweater.

It was such a relaxing and productive day. Just what the first day of fall called for.